Brass 3 Way Ball Valve 1/4 Female NPT 1000 PSI BV4 1/4

Brass 3 Way Ball Valve 1/4 Female NPT 1000 PSI BV4 1/4
  • Продавецwww.prada-handbags-sale.us
  • Список ценUS $20.00piece
  • Продажная ценаUS $20.00piece
  • ДоставкаБесплатная доставка
  • Рейтинги3,1 (280)

Oписание продукта

Note: The energy-saving module is only low-power point-saving, some specifications are not assembled, if you need, please contact us before purchasing. The cost of energy-saving modules is relatively high, I hope you understand.

The weight of the D50 is too heavy and will be shipped out of 2 parcels. It is limited by the weight of the logistics company. Please understand.

 
Need to know before buying:
This product can be opened for a long time, the coil will not burn out, the protection grade is IP65, moisture proof, waterproof; if your use is open for a short time, please choose cheap to meet your needs, the two products except the coil, the other sizes are the same .
 
Working principle: the valve is opened when the power is turned on, and the valve is closed when the power is turned off.
 
Click  Click "Normally closed (conventional coil)"
 
 

Thread specification

Type

PPR pipe diameter

Flow bore

L

H

D

 

G1/4”

2W025-08

(DN08)

12mm

2.5mm

40

76

42

 

G3/8”

2W040-10

(DN10)

15mm

4mm

50

87

50

 

G1/2”

2W160-15

(DN15)

20mm

16mm

63

104

55

 

G3/4”

2W200-20

(DN20)

25mm

20mm

68

110

55

 

G1”

2W250-25

(DN25)

32mm

25mm

86

125

72

 

G1 1/4”

2W320-32

(DN32)

40mm

32mm

90

134

76

 

G1 1/2”

2W400-40

(DN40)

50mm

40mm

106

160

87

 

 

 

dn15-1dn20-1dn15-3DN40-1DN40-2DN40-3DN40-4DN40-5DN40-61-31-41-6

Installation steps:
1.The threaded interface around the ribbons
2.According to the direction of access to the solenoid valve
3.According to the standard access power supply
4.Detection of sealing and circuit
 
Install the matters needing attention:
1.Before installation should keep clean pipeline
2.Be sure heart when installing electromagnetic in the pipe threads on the appropriate
   raw materials and adjust the position of the electromagnetic
3.Pay attention to the insulation of the circuit
4.Please install the electromagnetic direction according to the flow direction